Indicators & Results
Track indicators against their targets, and compare a baseline survey with an endline survey.
On this page
Indicators & Results has four tabs: Indicator Tracking, Baseline vs endline, PIRS Generator and Data Quality Assessment.

Track indicators against targets#
- Add your indicatorsOn Indicator Tracking, add each indicator with its baseline, target, unit and whether higher or lower is better. Then add the reporting periods.
- Enter the actualsType each indicator's value for each period. Achievement is the share of the distance from baseline to target that the latest value covers, and it updates as you type.
- Read the statusAn indicator at 90% or more is on track, at 70% or more is at risk, and below 70% is off track. Tiles at the top count all indicators, each status, and the indicators with no data yet.
Achievement by indicator#
Below the tiles, the Achievement by indicator figure puts every indicator that has a value on one axis, the one furthest behind at the top. Dashed lines mark 70% (at risk) and 90% (on track). Indicators with no values yet are listed under the figure. Export image saves the figure.
Baseline vs endline#
Did each indicator change between two survey rounds? Both rounds must be in one dataset, with a column that says which round each row is from.
- Pick the dataChoose a project and a dataset.
- Pick the round columnChoose the column that says whether a row is from the baseline or the endline. It must hold exactly two values. Swap changes which one is the baseline.
- Pick the indicatorsYes/no columns are compared as percentages and number columns as averages. Then press Compare baseline and endline.
- Read the resultEach indicator gets a sentence and a row in a table: baseline, endline, the change, its likely range (95%) and whether it could be chance. Print or save as PDF prints it.
PIRS and data quality#
- PIRS Generator drafts a Performance Indicator Reference Sheet for an indicator you name: its definition, data source, collection method and quality considerations. It is marked as an AI draft for review.
- Data Quality Assessment loads a project dataset and measures completeness, uniqueness, validity and precision from the data, and timeliness and consistency where the columns allow.
Something missing?
Have a question these docs don’t answer? Email support@nexmetry.org and we’ll add a guide.